• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

Cutting windmill blades

DMiller

Senior Member
Joined
Feb 21, 2010
Messages
16,550
Location
Hermann, Missouri
Occupation
Cheap "old" Geezer
Nukes are already determined as to decom
All materials that can be decontaminated or determined as NOT contaminated can return to common waste or recycling systems. The entire site after tear down is to be reclaimed sufficiently to allow open public usage. Is all notated and finances established as plant operates as to this.

Trojan was recently returned to before use access except for the guards center and the spent fuel storage facility that will both go away once the DOE takes possession to their facilities.
 

emmett518

Senior Member
Joined
Mar 24, 2021
Messages
810
Location
USA
Repurpose them into those tiny homes. Buy them on the cheap, cut it in half, use the big end for a bunker and the flat end for an approach or an awning. Sell the whole shebang for $ 25K installed to every prepper in the country........retire wealthy to some deserted island. Problem solved!!!!:D

Dynamite?

 

aighead

Senior Member
Joined
Apr 25, 2019
Messages
2,562
Location
Dayton, OH
@673moto good but I bet yuck! I can't imagine the chemicals needed to melt one of those down but I bet I wouldn't want to work there or the mines where they find these chemicals.
 

DMiller

Senior Member
Joined
Feb 21, 2010
Messages
16,550
Location
Hermann, Missouri
Occupation
Cheap "old" Geezer

aighead

Senior Member
Joined
Apr 25, 2019
Messages
2,562
Location
Dayton, OH
I picture similar to when you hose down packing peanuts with acetone. It would look cool. My guess is it's not that way at all.
 

DMiller

Senior Member
Joined
Feb 21, 2010
Messages
16,550
Location
Hermann, Missouri
Occupation
Cheap "old" Geezer
That much acetone then to remove that rom the solution to get a reusable component and maybe a reusable reduction component. Talking hundreds to thousands of gallons per blade. Then the human contact or exposure value. Have to find thos will to work in Air Supplied respirators and full body hazmat suits.

Then as loads to non usable what to do with the solvent???
 

673moto

Senior Member
Joined
Dec 5, 2019
Messages
319
Location
NorCal
Occupation
Slacker
It’s been brought up on other sites that this new tech is only for recycling the resins... the fibers are still wasted at this point
 

fast_st

Senior Member
Joined
Dec 1, 2010
Messages
1,468
Location
Mass
Occupation
IT systems admin
Good thought, depending on local noise regulations, some det cord to cut the blades into quarters in the long axis, then easier to munch up.
 

KSSS

Senior Member
Joined
Feb 27, 2005
Messages
4,332
Location
Idaho
Occupation
excavation
It would take a lot of det cord to cut those sections into smaller pieces. That fiberglass is thick. You would have to run multiple strands of 100 gn det cord on each cut to get through it. It would be interesting to try, I just wouldn't want to have to buy all the Det Cord.
 

Tones

Senior Member
Joined
Mar 15, 2009
Messages
3,078
Location
Ubique
Occupation
Ex land clearing contractor, part-time retired
In the early 80's is was working on a hydro dam excavation job and they were using a product called shear cord for doing the finish face cut in rock. It was about 5/8" diameter, looked like and behaved the same as det cord but with more grunt. Could be a possibility for cutting blades if it's still a thing.
 

KSSS

Senior Member
Joined
Feb 27, 2005
Messages
4,332
Location
Idaho
Occupation
excavation
I have never come across that type of det cord. 100 gn is the largest I have used and by comparison it is approximately a quarter inch in diameter, 5/8" in diameter would be pretty impressive.
 

Tones

Senior Member
Joined
Mar 15, 2009
Messages
3,078
Location
Ubique
Occupation
Ex land clearing contractor, part-time retired
https://images.app.goo.gl/ru2ajRpJbfNSqsiD8
Both faces to the right side of the spillway and between the powerhouse and dam wall is where shear cord was used. The waterway on the left was the diversion channel where it may have been used but that was before my time there.
 
Last edited:

Truck Shop

Senior Member
Joined
Dec 7, 2015
Messages
16,871
Location
WWW.
This thread------The oldest windmills around here are being revamped. There are lots full of cut up
blades.
 