I recently Acquired a Miller Dialarc HF-P Tig/Stick & Miller Regency 200 CC/CV with Aluminum Spool gun, The first Project i am Doing with it is a rake that will clamp on to the edge of an excavator bucket for spreading mulch.
So Far i have tacked the bottom and top lengths of angle together and tacked on 8" with 6" stick out pieces of 1" Rebar for the Tines, i still have to weld on some gussets behind the tines and attach some chain to hold it to the bucket.
Heres some Pictures of what i have so Far.
First is the 2 pieces of Angle tacked together
![640 rake 2.jpg 640 rake 2.jpg](https://www.heavyequipmentforums.com/data/attachments/80/80489-5d445eb60cd0dfe8615cbcdd70208288.jpg)
Second is with the Rebar tines sitting in place to finalize placement
![640 rake.jpg 640 rake.jpg](https://www.heavyequipmentforums.com/data/attachments/80/80491-e39a6d1ffdbb3866e2b5d5f79617e011.jpg)
Third is with the Rebar tacked on and rake set on bucket lip for test fit
![640 rake 3.jpg 640 rake 3.jpg](https://www.heavyequipmentforums.com/data/attachments/80/80490-77dcdd1554ff883b03cc9c27a72f2d18.jpg)
So Far i have tacked the bottom and top lengths of angle together and tacked on 8" with 6" stick out pieces of 1" Rebar for the Tines, i still have to weld on some gussets behind the tines and attach some chain to hold it to the bucket.
Heres some Pictures of what i have so Far.
First is the 2 pieces of Angle tacked together
![640 rake 2.jpg 640 rake 2.jpg](https://www.heavyequipmentforums.com/data/attachments/80/80489-5d445eb60cd0dfe8615cbcdd70208288.jpg)
Second is with the Rebar tines sitting in place to finalize placement
![640 rake.jpg 640 rake.jpg](https://www.heavyequipmentforums.com/data/attachments/80/80491-e39a6d1ffdbb3866e2b5d5f79617e011.jpg)
Third is with the Rebar tacked on and rake set on bucket lip for test fit
![640 rake 3.jpg 640 rake 3.jpg](https://www.heavyequipmentforums.com/data/attachments/80/80490-77dcdd1554ff883b03cc9c27a72f2d18.jpg)