lgammon
Senior Member
i just got done with a little job grading around a building. the grading contractor used gps dozer to grade the site and put in his contract that he would only grade from 10 feet out side of the building and beyond. i spent three days with a mini ex and a skid steer making sure the water drained away from the building and in to the yard drains. i was blown away with the fact that they didn't see this as there job. i feel sure that this was over looked when the gc accepted there bid. it seems that they had no idea how to grade any thing, and they left a young kid and the gps dozer to do it. is this what gps means in the future? that you just have to do the big wide open areas and the fine work is someone elses problem?