After a few hours Saturday, I dug out some more for the concrete trucks to get into the pad to pour the foundation. We have some big red pines which I downed. Few hours with the hoe and I finally moved the stump out. I figured the front end loader would pick it up. With the 207D tach'd out it lifted it about an inch and the pressure relieve was hit.
I was able to drag it to the field where I used the MF 165 to move it to the stump hole to rot. I have to say the case 580 is one hell of a machine :usa
![IMG_2408.jpg IMG_2408.jpg](https://www.heavyequipmentforums.com/data/attachments/142/142675-ed29077d1d3e0dded63d383c5e02a2fd.jpg)
I was able to drag it to the field where I used the MF 165 to move it to the stump hole to rot. I have to say the case 580 is one hell of a machine :usa