Coaldust
Senior Member
- Joined
- May 9, 2011
- Messages
- 3,466
- Location
- North of the 60
- Occupation
- Cargo Tanks, ULSD, RUG, Methanol, LPG
I realized I should have posted this over in the overload thread, because this project is already over-loading the local’s patience. The Hwy was never intended for this sort of traffic. School busses still stop on the Richardson to transport kids.
I’m surprised the permitting went through. AKDOT has plenty of work planned through FY25 adding passing lanes, bridge upgrades and such.
Fortunately, there are no steep grades, but there are some drop-offs and it won’t be long until trucks start falling off the road.
I’m surprised the permitting went through. AKDOT has plenty of work planned through FY25 adding passing lanes, bridge upgrades and such.
Fortunately, there are no steep grades, but there are some drop-offs and it won’t be long until trucks start falling off the road.