• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

addvise on EX size.

mudober

Well-Known Member
Joined
Jan 2, 2010
Messages
150
Location
So. IL.
Occupation
heavy equiptment operator
Stripping overburden topsoil/clay. Loading into belly dump semi-trailers. Maybe around 250 loads a day. I was thinking a cat 385 with a 80 inch 5 yard bucket. What are some other options I may have? I want to be fast and efficient. Stripping 40 acres 5 ft deep. I was thinking I would rent rather than purchase a machine. Thank You for your comments Mudober
 

Nige

Senior Member
Joined
Jun 22, 2011
Messages
30,164
Location
G..G..G..Granville.........!! Fetch your cloth.
What sort of material density are you looking at..? For only digging 5ft deep reach wouldn't appear to be your issue so what about a Mass Excavator configuration..? Shorter boom and stick so you lose out a bit on reach but gain with a bigger bucket capacity bucket so could move more tons/hour.

I think a 374ME would comfortably handle a 5cu.yd. bucket, and depending on material density a 365ME might just handle one as well.
 

clintm

Senior Member
Joined
Jul 7, 2013
Messages
974
Location
charlotte nc
Occupation
trucking,concrete recycling,grading, demolition
when loading topsoil / clay material into hwy trucks you have be careful how big of a bucket you use cause material will stick and clump together and not flow smooth out of the bucket it will bend or knock the gates off belly dumps I have loaded with 100,000 pd excavators with short sticks and 4-5 yd buckets and you still had to be careful especially on the first bucket in the truck and then if it's real heavy clay the bigger chunk's don't what to break up and come out very smooth :my2c
 

tdozer

Well-Known Member
Joined
Feb 23, 2006
Messages
74
Location
In the PINES! NJ
The company I used to work for had a couple hitachi 450's with short sticks and 4.75yd buckets. They handled the big buckets well although I think a 65-75 ton machine would have a little faster cycle time.
 

JimBruce42

Senior Member
Joined
Jan 15, 2006
Messages
965
Location
Pennsylvania
Occupation
operator
Company I work for, our 345 LME's had 5 (4.88 with side cutters) YD buckets, and handled them fine. I think a 365/74 would handle 6-7 yard buckets just fine. Like clintm said though, if it's a sticky soil, you have to be careful with that first bucket into on road trucks, especially belly dumps.
 

mudober

Well-Known Member
Joined
Jan 2, 2010
Messages
150
Location
So. IL.
Occupation
heavy equiptment operator
Thanks Guys, I didn't think about the the big chunks not passing thru. Rent will be cheaper on a smaller machine too. So I am learning I know this is the site for that. The clay around here can be pretty hard if dry and chunky and sticky if a little wet. Mudober
 

clintm

Senior Member
Joined
Jul 7, 2013
Messages
974
Location
charlotte nc
Occupation
trucking,concrete recycling,grading, demolition
sometimes in these situations a smaller bucket will give you the same or better production because of faster cycle times
 

Nige

Senior Member
Joined
Jun 22, 2011
Messages
30,164
Location
G..G..G..Granville.........!! Fetch your cloth.
sometimes in these situations a smaller bucket will give you the same or better production because of faster cycle times
The shorter boom and stick of an ME machine will also improve cycles times because there is less weight to swing. Set up properly (truck position with respect to the excavator) ME machines are super-quick on cycle times.
 
Top