I was wondering if anyone here has experience with concrete arch pipe? I'm looking at a job sitting some 18 by 28.5 arch pipe. I've did lots of rcp but didn't know what you all would consider the smallest machine possible to lay this with. The joints are 8 feet long and weigh about 2500 lbs.