We have started the final stage of are highway job in LA and that is cutting soil cement on 4 miles of highway, and let me tell you it hs been one of the hardest most frustrating things ive ever done in my dirt moving career. We usually do around 18-20 loads a day, which is roughly 2500ft, and once the tiller has mixed it up you dont hve long before it starts sittin up, and being that we only have a .03 tolerance it takes a little time. But it has made me a better blade hand, nd hs been a blast.
here are some photos
here are some photos