Excavator759
Active Member
- Joined
- Dec 17, 2009
- Messages
- 38
- Location
- Warren Ohio
- Occupation
- excavator, demolition, site work contractor
I have 1.2 miles of Railroad track to remove on a china factory demolition. i searched the site because i thought this was discussed but came up empty. i was planning on using my hitachi 160 with a 24'' bucket with a hole cut out in the back of the bucket. i planned on sliding the track thru the bucket and kind of prying on it like the claw of a hammer. the track is 20' lenghts. Any other methods or suggestion would be great!