caterpillarmech
Senior Member
Nice thread Lee. It is cool to see some of the larger jobs. I work mainly on rental stuff but that means very little here lately. And I was 2/8 Cav Dec95 to Sep 98. Had bunch of buddies in 2/5 All Mortars.
Great info there. When you say you advance the timing by 0.5 to 1 mm to increase power how would that relate to degrees as in BTDC?
Nice thread Lee. It is cool to see some of the larger jobs. I work mainly on rental stuff but that means very little here lately. And I was 2/8 Cav Dec95 to Sep 98. Had bunch of buddies in 2/5 All Mortars.
[/QUOTE]Hi body,
I just wonder what is the name of tool on the boom at the bottom picture? is it electrode gun?
https://www.heavyequipmentforums.com/showthread.php?20734-Some-random-work-pictures/page7
Thanks
Case was welded and then I had it washed out.
Installed both rebuilt clutches. Now my back is aching.
View attachment 96846
Where the hell have that 938 been running? that thing is filthy....
Lee-online, i was looking at that picture of the clutch/brake assembly installed, in the top of that case on the right side there is that 2" x 2" piece of iron welded to the case what is that for? tooling install? just wondering.........................................theironoracle