kmbrad
Member
Hi All
Looking at getting an Allu screening bucket for my L70.
It's got a 3rd line already to quick hitch the bucket. I will need a 4th line to run the attachment.
http://s6.postimg.org/76qf1r869/IMG_0922.jpg
Looking in my book, this is the circuit I currently have:
http://s6.postimg.org/udarh6f4x/IMG_0918.jpg
This is the circuit for the 4th line.
http://s6.postimg.org/vr2echee9/IMG_0920.jpg
My question is, can I just split the 3rd line circuit? So in theory it would have a T piece at the end of each the existing pipes, then the four pipes would have a tap to divert the fluid? As the 3rd line lever in the cab is just used to connect or disconnect the bucket, you could close the taps once connected then use the same lever to divert the fluid to run the attachment?
Any thoughts would be greatly received.
Cheers
Karl
Looking at getting an Allu screening bucket for my L70.
It's got a 3rd line already to quick hitch the bucket. I will need a 4th line to run the attachment.
http://s6.postimg.org/76qf1r869/IMG_0922.jpg
Looking in my book, this is the circuit I currently have:
http://s6.postimg.org/udarh6f4x/IMG_0918.jpg
This is the circuit for the 4th line.
http://s6.postimg.org/vr2echee9/IMG_0920.jpg
My question is, can I just split the 3rd line circuit? So in theory it would have a T piece at the end of each the existing pipes, then the four pipes would have a tap to divert the fluid? As the 3rd line lever in the cab is just used to connect or disconnect the bucket, you could close the taps once connected then use the same lever to divert the fluid to run the attachment?
Any thoughts would be greatly received.
Cheers
Karl
Last edited: