Sberry
Senior Member
I am working on a loader and the bucket arm bush is outright gone, been for a long time and the po had come up with a greasee scheme must have worked for a while. Assuming we simply weld up the hole or shim/weld up with heavywall pipe and side shim it to reduce dirt, pump some moly 3 in to it nd let it wear steel to steel how long could we expect to run it?