The fence posts show roughly where the house will be. He cut in the drive and the garage.
Took it down anywhere from 6" to 18" trying to find the subsoil. Stock piled the topsoil to the side as it will be needed later.
Went a little lower in some spots as the ground was a bit soft.
He'd push up a pile and then sweep it off to the side.
Took it down anywhere from 6" to 18" trying to find the subsoil. Stock piled the topsoil to the side as it will be needed later.
Went a little lower in some spots as the ground was a bit soft.
He'd push up a pile and then sweep it off to the side.