• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

Search results

  1. EarthRockHill

    Experienced Shear and Grapple Operators

    We are currently (posted January 2013) looking for experienced shear and grapple operators for a large demolition project in central Ohio. Have been to the local hall but only found dirt guys. Anyone out there? Message me for details.
  2. EarthRockHill

    MCM drops GM Pontiac East Assembly Plant Vent Stacks **video**

    MCM Industrial Services of Bloomfield Hills, Michigan, USA working to demolish the General Motors Pontiac East Assembly Plant in Pontiac, Michigan brought 6 - 200 foot Paint Shop Ventilation Stacks to the ground on Thursday, February 2nd, 2012 at approximately 2:00 PM. Under the direction of...
  3. EarthRockHill

    Barletta's 2250 Builds Boston's North Bank Bridge ***video**

    http://www.youtube.com/watch?v=5xxTBEI1390 During the early morning hours of October 3rd, 2011 Barletta Heavy Division assembled the three final superstructure segments of the North Bank Pedestrian Bridge in Boston, Massachusetts. Using their own 300-ton Manitowoc 2250, and assisted by...
  4. EarthRockHill

    93FAST14 - Bridge Replacement Project- Demolition Video

    Lets see...... How's this for a heavy equipment list all working at the same time for 10 hours at a time, over 10 weekends, wrecking 14 bridges? http://www.youtube.com/watch?v=HrofMnqkObM 2- Komatsu PC1250's with Jewell Demolition Packages with LaBounty Shears 1- Komatsu PC800 with Grapple 10...
  5. EarthRockHill

    Hallamore's Terex/Demag CC2800 w/Luffer **in-cab-video**

    This 9 minute video features cameras mounted in the cab, under the main chassis, on the block and at the point of delivery. The Chelsea Street Bridge is a $125-million vertical lift bridge with a 450-foot span and a 175-foot clear height at full lift. On December 13th, 2010 two 18 foot...
  6. EarthRockHill

    Chrysler Plant in St. Louis **video**

    MCM Management Corp. (mcmdemo.com) out of Bloomfield Hills, Michigan is a world class industrial services company that specializes in industrial demolition, equipment rental, asbestos abatement, and metals recycling. Their most current project, the demolition of the 2.4 million square foot...
  7. EarthRockHill

    Marble Hill Ohio River Reclamation Project **video**

    At the peak of its construction phase in 1984 Marble Hill Nuclear Power plant employed over 8,000 workers. 6 years and $2.8 billion into the construction the facility was scuttled being only 40% complete. Poor construction methods and a lack funding for the remaining $7.4 billion were to...
  8. EarthRockHill

    Labor Day Tribute **video+photos**

    While most of you might not see this post until later in this evening, lets all remember why it is that we have this National Holiday in the United States of America. Labor Day honors the social and economic contributions that the American worker has made to the growth health and prosperity...
  9. EarthRockHill

    Building the Chelsea Street Bridge **video**

    J.F White Contracting comes one step closer to the completion of the new Chelsea Street Bridge with the addition of the East upper leg portion of the South Tower. Crews worked through the night to extend the crane pad so that an early morning lift was possible. Once everything was in place...
  10. EarthRockHill

    Ironworkers on Chelsea Street Bridge **video**

    Local 7 Ironworkers out of South Boston, MA have toiled since February 2010 to build the support towers of a unique center span lift bridge over the Chelsea River between Chelsea and Boston, Massachusetts. Employed by Saugus Construction Corp. , under lead contractor, J.F. White Contracting...
  11. EarthRockHill

    Paving over Giants Stadium **video**

    Gramercy Group Inc. finished primary demolition of Giants Stadium on June 27th, 2010 and began filling in the bowl with 250,000 cubic yards of reclaimed soil. See my video on that process in Dozers. A 2 foot thick cap of compacted sand gets topped by another 6 inches of compressed and...
  12. EarthRockHill

    Filling in Giants Satdium: Moving the Earth **video**

    Gramercy Group, Inc. (www.gramercygroupinc.com) was the lead demolition contractor that brought Giants Stadium to the ground in less than 5 months. After the last standing structure of Giants Stadium was demolished and clean up was complete a new task began. Filling in the bowl and foundations...
  13. EarthRockHill

    Reeving the Block **video**

    Local 7 Ironworkers and Hallamore Crane Operations Crew reeve the block of a Demag AC 600-ton telescoping crane from left to right with 24 mm CASAR cable and 1,804 feet of line on the main winch. Working as a team they thread the cable on a brisk April dawn in preparation for a 200-ton trip and...
  14. EarthRockHill

    Giants Stadium Demolition Complete **video**

    Gramercy Group, Inc. (gramercygroupinc.com) completed primary demolition of Giants Stadium in East Rutherford, NJ at the Meadowlands Complex on Monday, June 28th, 2010 with the Final Down of the South West Radius at Gate C. At approximately 8:14 PM under partly cloudy skies the 6 tier radius...
  15. EarthRockHill

    Gramercy Group Demoltion of Giants Stadium-April2010

    On February 4th, 2010 Gramercy Group (www.gramercygroupinc.com) began principal demolition of the 34 year old Giants Stadium in East Rutherford, NJ. It wasn't until April 27th, 2010 that I set foot on-site to shoot what remained of the stadium and the demolition process going forward...
  16. EarthRockHill

    New Giants Stadium Video

    This one is here to stay.....(had some 'complications' with the last one...) Gramercy Group, Inc. demolished the press box at Giants Stadium at The Meadowlands in East Rutherford , New Jersey on the evening of May 19th, 2010. A traditional 'pull-down' method successfully and safely brought...
  17. EarthRockHill

    Demolition of Giants Stadium **video**

    Gramercy Group Inc., out of Westbury , NY is the demolition and wrecking contractor for Giants Stadium at the Meadowlands Sports Complex in New Jersey. Using a traditional pull down method they bring down upper deck sections 306-308 at Giants Stadium on April 27th, 2010. This is their 6th...
  18. EarthRockHill

    Video- Demag CC2800 Lifts in Boston

    Last week Hallamore's CC2800 Demag lattice crane with 550 tons of weight and its Superlift (maxer) configuration lifted, walked, and placed two HUGE primary leg support structures of the north tower of the Chelsea Street Bridge in Chelsea, MA. The road and existing bridge was closed for 7...
  19. EarthRockHill

    J.F. White Project Portfolio Video

    As an ever increasing trend of using video to showcase your work J.F. White Contracting out of Framingham, MA hired me to put together a 2 1/2 minute project portfolio video for them. http://www.jfwhite.com/projects-video-portfolio.htm Using newly obtained footage and archived company...
  20. EarthRockHill

    Jewell Unveils New Promo in Vegas

    Jewell Attachments unveils their new Promotional Video at the National Demolition Association Tradeshow in Las Vegas, NV on March 21st. Here is a sneak peek of that promo. Compiled from footage and highlights over the last 4 years and consisting of three separate scores. The video shows...
Top