So I'm fairly new to the mobile / on-site repairs and have mostly done smaller repairs in the shop. I know it's easy to say add xx amount to your hourly rate but I'm also looking for some estimates on how long this should have took to guage myself on efficiency.
So, you experts submit your quotes on how many hours this would take you, and how much would you charge for this mobile repair in the Seattle area.
The repair: 6 inch x 2 inch beam on a front loader bucket linkage. There was a bunch of garbage weld repair with side plates that was previously done that didn't hold, needed to be arc gouged out. Arc gouging bad weld (and new weld build up) extended onto the pin boss.
(Yes I did grind it down to nearly an open root before welding).
Pics
So, you experts submit your quotes on how many hours this would take you, and how much would you charge for this mobile repair in the Seattle area.
The repair: 6 inch x 2 inch beam on a front loader bucket linkage. There was a bunch of garbage weld repair with side plates that was previously done that didn't hold, needed to be arc gouged out. Arc gouging bad weld (and new weld build up) extended onto the pin boss.
(Yes I did grind it down to nearly an open root before welding).