The average slope was 47-50 degree. 100% of the concrete for foundations was flown in by helicopter along with form materials, re-bar and then all the towers. It was a hike-in/ hike-out every day job.
Brian
100% of the concrete for foundations was flown in by helicopter along with form materials, re-bar and then all the towers. It was a hike-in/ hike-out every day job.
Brian