Sweet Pictures. I'm curious if you lost much engine power from working at that high of altitude?
Changed tires and mounted the winch?Do you have 2 spider hoes?? I ask because the one on the mountain it looks as if the windows are tinted and the one in the creek is not?
The average slope was 47-50 degree. 100% of the concrete for foundations was flown in by helicopter along with form materials, re-bar and then all the towers. It was a hike-in/ hike-out every day job.
Brian
Yup them's crazy
CS
Did you have any pics of the machine being carried in by the helo? At least thats how i'm guessing you got it there...